You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Application executions dispatched through the warm pool leave consumed one-shot CF apps behind after their final result. runner_pool_size=1 limits standby slots, but consumed Application slots are excluded from that capacity count and only probe/platform cleanup currently removes them. CF restarts the one-shot web process, retaining its memory allocation.
Observed in Dev: ten warm apps consumed the full 10 GiB organization quota; the next release could not stage its Runner template because staging needed another 1 GiB. The existing app and current Runner droplet remained aligned.
Required fix and acceptance:
Retire only durably completed (succeeded/failed) Application dispatches with exact job, app and source-droplet binding.
Preserve running jobs, ambiguous/reconciliation cases, state and saved plan artifacts. Expiry alone is insufficient.
Reuse the existing scoped CF removal path, retaining retryable leases on cleanup failure.
Cover authorization and binding failures with real database regressions.
Safely reconcile historical completed apps, then verify a Dev deployment and a pool of one standby without accumulating completed runners.
No customer Plan/Apply, force unlock or state deletion is part of this issue.
Validation: full Configurator check (1056 passed, 71 gated skips), real PostgreSQL identity/pool regressions, final focused pool suite (12 passed), platform database suite (63 passed), and 328 desktop/mobile browser tests. The initial CI attempt timed out after an 8m11s OS dependency download; the unchanged-source retry completed the full suite, as documented in the PR.
The explicit Dev mode skipped Assistant live qualification; the Assistant remains enabled and normal qualified-release gates are unchanged. No customer Plan/Apply, State change or unlock was performed as part of this fix.
Activity
fix(runner): clean up completed Application pool runners (#148)
lweberru commentedon Oct 23, 2026
Resolved by #148 and deployed to Dev in release 39974933974, source
1f7b2da8bd175257983213329a212b932c0bac04.Live verification after deployment:
Validation: full Configurator check (1056 passed, 71 gated skips), real PostgreSQL identity/pool regressions, final focused pool suite (12 passed), platform database suite (63 passed), and 328 desktop/mobile browser tests. The initial CI attempt timed out after an 8m11s OS dependency download; the unchanged-source retry completed the full suite, as documented in the PR.
The explicit Dev mode skipped Assistant live qualification; the Assistant remains enabled and normal qualified-release gates are unchanged. No customer Plan/Apply, State change or unlock was performed as part of this fix.