You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Revisit E3's early 'cancelled' write now that G4 wired the planning endpoints #156
docs/implementation/runner-lifecycle.md, decision 2, keeps E3 writing cancelled before the provider settles (a read-only-phase exception) and says: "Revisit this when G4 wires the planning endpoints." G4 merged in PR #152, but no PR or document records that revisit. A reader cannot tell whether the exception still stands.
Acceptance
Decide whether E3's early cancelled write stays, now that the browser drives drafts and suggestions through F's production endpoints (G2–G4).
Record the decision and reason in decision 2 of docs/implementation/runner-lifecycle.md.
If the behaviour changes, add a regression that fails under the old behaviour.
Activity
Link the Lane G close-out follow-ups (#155, #156) (#145)
Close out Lane G status records (#145) (#154)